Medic_Baptiste
New member
I’ve run into an issue with my PowerShare setup. Here’s the situation: I had the Backup Gateway, Backup Switch, and Universal Wall Charger installed back in March 2024. The Universal Wall Charger works fine, but the Backup Switch hasn’t been fully connected yet because PG&E needs to finalize the installation.
Yesterday, I got two emails from Tesla at 5 PM offering to “redesign” my PowerShare installation. I’m not even sure what that means. The installer here in the Bay Area mentioned I was only the second non-Tesla employee in the area to get this setup. Interestingly, I haven’t paid the installation company yet since the final step hasn’t been completed.
Anyone else experienced this or received these emails? Curious what “redesign” might involve and if this has happened to others in PG&E territory.
Yesterday, I got two emails from Tesla at 5 PM offering to “redesign” my PowerShare installation. I’m not even sure what that means. The installer here in the Bay Area mentioned I was only the second non-Tesla employee in the area to get this setup. Interestingly, I haven’t paid the installation company yet since the final step hasn’t been completed.
Anyone else experienced this or received these emails? Curious what “redesign” might involve and if this has happened to others in PG&E territory.